Energy Market Information

Disclaimer: Whilst South Hook LNG aims to ensure that information published on these webpages is accurate and given in good faith and to the best of our knowledge at the time of publication, all information is published without any warranty of any kind, express or implied, as to the accuracy or timeliness of such information. South Hook LNG shall not be liable for any losses or damage, whether direct or indirect, consequential, special or otherwise, that may result from the use of or reliance on such information.

Publication according to Article 4(1) of REMIT - Urgent Market Message (UMM).

The South Hook LNG Terminal is not currently experiencing any significant flow capacity restrictions.

View information on instantaneous gas flows into the National Transmission System on the National Grid Website.

Available UIOLI Capacity

We have determined that there is sufficient spare capacity in the terminal to accept a 125,000m3 ship based on QGII lean specification LNG. Send out rights will allow even send out of the ship volume from 13-MAY-2017 to 19-MAY-2017 inclusive. It may be possible to accept larger ships or richer LNG. The berthing slot date will be determined based on the ship size but will be between 12-MAY-2017 and 19-MAY-2017

For any other information or help you require with regard to UIOLI capacity please contact:

Elvan Akkaya
Commercial Adviser
South Hook LNG Terminal Company Ltd
Level 28
The Shard
32 London Bridge Street
London
SE1 9SG
Tel: +44 (0) 20 7234 8466 Email:

Public Message


Please check back regularly for updates to available UIOLI capacity.